The following changes have been made to the geometry: -- A model for the beam profiler has been added just after the entrance of the beam pipe to the collimator cave. This consists of a lead sheet as a converter and two layers of scintillating fibers. -- The 1x10^-3 pair converter was put in the beam line just before the pair spectrometer magnet. -- A 1 cm thick piece of scintillator (active target) was placed downstream of the beam pipe in the hall before the commissioning target assembly. -- The 2 mm thick plastic target was replaced with a 1 cm thick plastic target